Guide

Office Moving Checklist

A practical timeline for Australian businesses planning an office relocation. Work backwards from your move date — most office moves need eight to twelve weeks of lead time to avoid surprises with IT, vendors, and your lease.

8–12 weeks out: plan and budget

8–12 weeks
  • Confirm the new office address, floor plan, and move-in date.
  • Set a relocation budget, including removalists, IT, fit-out, and contingency.
  • Appoint an internal move coordinator and assign a backup.
  • Review your current lease for exit conditions, make-good, and notice periods.
  • Request quotes from at least three licensed commercial removalists.

6–8 weeks out: vendors and infrastructure

6–8 weeks
  • Confirm your removalist booking in writing and lock in the date.
  • Brief IT on internet, phone, server, and Wi-Fi cutover timelines.
  • Order any new furniture, monitors, or fit-out items with long lead times.
  • Notify cleaners, security, building management, and waste services.
  • Update business address with the ATO, ASIC, banks, insurers, and suppliers.

3–4 weeks out: staff and logistics

3–4 weeks
  • Communicate the move date and new address to every staff member.
  • Assign desks, parking, and access cards for the new location.
  • Audit storage, archives, and confidential files — decide what to keep, archive, or shred.
  • Order labelled crates and packing materials from your removalist.
  • Book elevators and loading docks at both buildings for moving day.

1–2 weeks out: pack and verify

1–2 weeks
  • Start packing non-essential items, books, and stored equipment.
  • Label every crate and item with destination room, owner, and priority.
  • Confirm utilities, internet, and alarms are active at the new office.
  • Back up servers and critical data. Document every device being moved.
  • Send a final reminder to staff with the moving-day plan and contacts.

Moving day

Day of
  • Walk the old office with the removalist lead before loading starts.
  • Keep critical IT equipment (servers, switches, key laptops) on a separate run.
  • Have one team member receive items at the new office and check off the inventory.
  • Photograph any existing damage at both locations before furniture is placed.
  • Confirm payment terms, sign the job sheet, and capture the final invoice.

First week in the new office

Week 1
  • Verify every workstation, phone, and meeting room is operational.
  • Update Google Business Profile, website, email signatures, and social profiles.
  • Walk through the old space and complete any make-good obligations.
  • Run a short staff survey to capture issues and lessons learned.
  • Schedule a follow-up with your removalist for any outstanding items.